What are the installation methods for NMRVE63/130-1500:1 worm gear reducer
The installation method of NMRVE63/130-1500:1 worm gear reducer is similar to that of NMRV series reducer, and the common installation methods are as follows:
Foot installation: Use bolts to fix the installation feet at the bottom of the reducer to the foundation or equipment bracket. This is a common installation method and is suitable for most conventional application scenarios.
Flange installation: It can be divided into reducer flange installation and output flange installation. The installation of the reducer flange surface is to directly connect and fix the flange surface of the reducer with the installation surface of the equipment; The installation of the output flange is achieved by connecting the flange at the output end to the load device. This installation method ensures high coaxiality and transmits large torque.

Hollow shaft installation: Place the hollow shaft sleeve of the reducer on the load shaft, and then fix the two through keys, expansion sleeves, and other methods to achieve power transmission. This installation method can save installation space and has a compact structure.
Torque arm installation: Use the torque arm to fix the reducer to the equipment. The torque arm can withstand the reaction torque generated by the reducer during operation, and is suitable for situations that require frequent start stop or large load changes.
Small flange installation: Installation is carried out through small-sized flanges, generally used in environments with compact space, which can meet the installation requirements of some special equipment.